This Saturday Nov 18th after our Monthly breakfast we will begin work on our shiny new floor. Here’s what we will need to do:
Move EVERYTHING to the back half of the hangar.
Preparation is everything.
Thoroughly clean the floor: 1st vac, then scrub/clean with cleaner, then etch with TSP (TriSodiumPhosphate), then rinse, then patch, where needed, with grout.
We will need to keep the place well heated to get good bonding for the paint, so the mechanical timer switches will need to be temporarily replaced with regular switches.
Then, on Sunday the 19th at 2:30 we can do the fun part. Actually roll on the paint.
We already have 6 Gallons of BEHR one part epoxy paint (silver gray). Cleaner, TSP, Mop, bucket, water, Sandpaper, patching grout, Paint roller, Pan, Cutting in brushes, etc.
We can decide on Saturday whether we want to do the 2nd half of the floor on the following weekend (Thanksgiving week end) OR on Dec 2nd (The Joint Christmas Party at John Stahrs date)
See you there. President John